BACKGROUND
The 2018 Regional Surface Transportation Program Arterial Resurfacing Project:
- Replaced failed sections of asphalt roadway pavement;
- Resurfaced with microsurfacing;
- Reconstructed Curb Ramps to comply with ADA requirements; and
- Replaced signal detector loops at various locations throughout the City.
The streets included in the project were portions of (see attached map for locations): Blue Oaks Blvd.; Cirby Way; Estates Dr.; Eureka Rd.; Foothills Blvd.; Folsom Rd.; Harding Blvd.; Orlando Ave.; Pleasant Grove Blvd.; Riverside Ave.; East Roseville Pkwy.; Sierra College Blvd.; Sutter Ave.; Stanford Ranch Rd.; Vernon St.; Douglas Blvd; and Woodcreek Oaks Blvd.
Staff determines which Roseville streets are to be resurfaced with the aid of a pavement management system software that optimizes the timing of resurfacing projects based upon road condition and available funding.
The Public Works Engineering Division has made the final inspection of the 2018 Regional Surface Transportation Program Arterial Resurfacing Project and has found the work to be completed in accordance with the improvement plans and City Specifications and is now ready for acceptance. As required by the Specifications and Faithful Performance Bond, the Contractor shall guarantee the installation of all improvements for a period of 12 months from the date of the Notice of Completion.